Invest · Project Ironbark · Victoria, Australia

A gigawatt of energisable land, in the right city, with the power question already answered.

Project Ironbark is QORINAI's flagship AI campus: a single greenfield freehold beside a 500 kV transmission corridor in one of Australia's fastest-growing data-centre markets, with a formal 1,000 MW connection response from the state's transmission planner already in hand. We are inviting energy, equipment and infrastructure partners to join before the planning application — the point at which a feasible site becomes an approved one.

1,000 MWconnection assessed feasible — formal, rules-based response
4 × 250 MWrepeatable modules, each with its own substation
3 layerstransmission, distribution and on-site generation
36 monthsfrom application to first energisation

The thesis

Australia has no shortage of planned data centres. It has a shortage of energisable land. This project ran the power process first.

  • 01 · SCARCITYClose to unrepeatable

    A gigawatt-scale, transmission-assessed greenfield site inside a capital city, beside a vacant 500 kV easement. The planner supports only one new shared terminal station per radius — the first proponent to lock a location becomes the hub others must connect to.

  • 02 · DE-RISKEDThe authorities have already answered

    Grid, gas, water, sewer, stormwater, communications and planning have all responded: every service is confirmed feasible. The technical and regulatory groundwork that usually takes a developer years is done.

  • 03 · SCALEFirst-tier by any Australian measure

    At 1 GW the masterplan is larger than every grid-connected campus under construction in the country today, and the only one with gas firming and grid-forming storage designed in rather than diesel standby bolted on.

  • 04 · REPEATABLEOne module, four times

    Each 250 MW block is sized to sit inside the grid's contingency limit and staged-load profile. Every repeat uses the same engineering, the same approvals and the same supply chain — execution risk falls with each module.

  • 05 · RE-RATINGAn asset that steps up at every milestone

    Freehold land held outright. Planning approval and a locked connection location turn a greenfield into powered land; connection agreements make the 1 GW pathway contractual; first energisation makes it an operating platform.

  • 06 · DEMANDSovereign compute the market cannot source

    Hyperscalers, AI labs and government workloads need Australian-hosted, liquid-cooled GPU capacity at scale. Long-run capacity in a metropolitan corridor is what the largest tenants are competing for.

Market context

The gap is power, not demand.

Victorian pipeline9 GW+of planned data-centre capacity across 30+ projects
Expected online by 2030~0.7 GWindustry estimate — the rest is waiting on power
Data-centre demand4 → 12 TWhFY25 to FY30, ~25 % growth a year
Storage market#3 globallynational battery fleet past 9 GW; 33 GW in the connection queue
Where the market is goingGigawatt campuses are the new unit

The largest AI operators are building 1 GW+ campuses — and every one of them is a power project first, with on-site generation bridging the grid.

Why AustraliaOECD market, public rulebook

The planner's, market operator's and network's documents are public and verifiable. Entry cost is an order of magnitude below North American campuses, with OECD-grade regulation.

Why this corridorWhere the hyperscalers already are

Global cloud operators and Australia's largest developers are all committed to the same northern growth corridor. This site sits closer to the city than the corridor's largest announced parcel.

Why nowThe response has a clock

The formal connection response is valid for a fixed window. Entering before the planning application captures the step from "feasible" to "approved".

What is already done

Five modules of infrastructure and commercial planning, delivered.

  • Masterplan design

    Whole-of-site spatial plan with a 1 GW IT end-state, delivered as a repeatable 250 MW module fed from a new 500 kV terminal station.

  • Grid connection & feasibility

    Formal confirmation that a 1,000 MW connection is technically feasible; connection blueprint, contingency limit and system-strength figures quantified.

  • Energy & microgrid

    Gas firming plan and pipeline scoped with the network; grid-forming battery storage for stability and self-sufficiency.

  • Land, environment & utilities

    Zoning and overlays established; water, sewer and stormwater positions mapped; carrier lead-ins confirmed at the boundary.

  • Commercial baseline

    Current-use valuation, module cost and lease-revenue model completed — available in the data room under NDA.

Ways to participate

Four structures that can be combined.

A · Energy partner

Behind-the-meter power JV

Co-own gas generation, battery storage and on-site transformation; sell to the campus under a long-term PPA or tolling agreement. Infrastructure yield plus the right to tell the story as the energy-system owner.

SUITS · ENERGY & STORAGE COMPANIES
B · Equipment + equity

Preferred supplier with a minority stake

Preferred supply of BESS, PCS, inverters and substation equipment, with minority equity in the project company. An export track record in an OECD market plus durable naming rights.

SUITS · EQUIPMENT MANUFACTURERS
C · Devco equity

Development-stage investment

Enter before the planning application and participate through land, connection and approvals — capturing the step-up from "feasible" to "approved". Suits an investor building an Australian platform.

SUITS · INFRASTRUCTURE & PE CAPITAL
D · Showcase anchor

Technology demonstration and naming

A smaller commitment in exchange for energy-system naming, an on-site demonstration centre, joint announcements and industry-event priority. Suits brand and market-entry objectives.

SUITS · NEW-ENERGY BRANDS ENTERING AUSTRALIA

Hard, quantified needs

System strength, a contingency limit, power-factor and reactive limits, interruptible-load duties — written into the transmission response. Storage and power electronics are engineering requirements here, not a sustainability add-on.

One accountable operator

QORINAI develops, builds and operates the whole chain — land and power, design, hardware through our strategic shareholder Hyperscalers, cluster deployment, 24×7 GPU operations and a sovereign cloud. One team from the substation to the token.

Naming and showcase rights

Energy-system naming, an on-site demonstration centre and joint authorship through the connection application — a flagship overseas reference case for a partner's technology.

How to engage

From first call to term sheet in about ten weeks.

STEP 1Introduction

Email finance@qorinai.ai with your organisation and area of interest. We reply within one business day.

STEP 2NDA & teaser

Mutual NDA, then the full investment teaser: site identification, the formal grid response, valuations and the module economics.

STEP 3Data room & workshop

Existing Infrastructure Review, authority responses, surveys and models. A joint technical workshop on storage sizing, the system-strength election and gas–battery coordination.

STEP 4Structure & term sheet

Agree the participation structure (A–D or a combination) and sign a term sheet ahead of the connection application and planning lodgement.

Where exactly is the site?

In Melbourne's northern growth corridor, Victoria, beside a 500 kV transmission line. The exact parcel, survey and aerials are disclosed under NDA.

What is the size of the investment?

Structures range from a showcase-anchor commitment to development-stage equity in the project company. Budgets, valuations and returns are set out in the teaser and data room under NDA.

Is the power actually approved?

The transmission planner has issued a formal Connection Enquiry Response under the National Electricity Rules confirming a 1,000 MW connection is technically feasible and defining the pathway. The next steps — connection application, Use of System and Connection Services Agreements — are what the partnership funds.

Who is behind the project?

QORINAI Pty Ltd, an Australian AI data-centre developer and operator headquartered in Sydney, backed by strategic shareholder Hyperscalers, Australia's open-OEM server manufacturer. Our delivery partners have built and operated high-density compute in Australia since 2008.

What is the timeline?

About 36 months from application to first energisation: roughly 14 months to construction approval, then 22 months to build the 500 kV terminal station, storage and the first 250 MW building — inside the planner's indicative commissioning window.

Important notice. This page is for preliminary information only and is not an offer, investment advice or a commitment of any kind. The Connection Enquiry Response is a preliminary assessment under NER clause 5.3.3, not an agreement to augment the Declared Shared Network. Responses from network and utility operators are preliminary, indicative and non-binding. Site identification, commercial terms, budgets, valuations and returns are available under NDA only. "Project Ironbark" is a working name.

Power first. Then the campus.

Teaser, data room and technical workshop for qualified energy, equipment and infrastructure partners.