<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>QORINAI Insights</title>
    <link>https://qorinai.ai/insights/</link>
    <atom:link href="https://qorinai.ai/insights/feed.xml" rel="self" type="application/rss+xml"/>
    <description>Short, technical pieces from QORINAI on AI data-centre design, power and transmission, GPU hardware generations, the Qinari SPV model and private enterprise AI in Australia.</description>
    <language>en-AU</language>
    <copyright>QORINAI Pty Ltd</copyright>
    <item>
      <title>The Qinari Model: Why Every AI Infrastructure Partnership Should Be Its Own SPV</title>
      <link>https://qorinai.ai/insights/qinari-spv-model.html</link>
      <guid isPermaLink="true">https://qorinai.ai/insights/qinari-spv-model.html</guid>
      <description>Qinari is QORINAI&#x27;s SPV platform — one ring-fenced vehicle per project. Why infrastructure partners, equipment lenders and overseas co-investors prefer a single-purpose company to a share of the whole business.</description>
      <pubDate>Sat, 19 Sep 2026 09:00:00 +1000</pubDate>
    </item>
    <item>
      <title>Why the Next AI Hall Is Designed at 250 kW per Rack</title>
      <link>https://qorinai.ai/insights/250-kw-rack-design-point.html</link>
      <guid isPermaLink="true">https://qorinai.ai/insights/250-kw-rack-design-point.html</guid>
      <description>Vera Rubin racks draw 190–230 kW and Rubin Ultra is heading for 600 kW. A data hall designed at 150 kW per rack in 2026 is obsolete on the day it energises. What a 250 kW design point changes.</description>
      <pubDate>Fri, 18 Sep 2026 09:00:00 +1000</pubDate>
    </item>
    <item>
      <title>Why Enterprises Are Bringing LLMs Inside Their Own Network</title>
      <link>https://qorinai.ai/insights/llms-inside-the-network.html</link>
      <guid isPermaLink="true">https://qorinai.ai/insights/llms-inside-the-network.html</guid>
      <description>Data sovereignty, IP retention, predictable cost and latency are pushing Australian enterprises from public AI APIs to on-premises and private-cloud LLMs. What changes, and what it takes to run.</description>
      <pubDate>Fri, 18 Sep 2026 09:00:00 +1000</pubDate>
    </item>
    <item>
      <title>Australia&#x27;s Data-Centre Gap Is Power, Not Demand</title>
      <link>https://qorinai.ai/insights/power-not-demand.html</link>
      <guid isPermaLink="true">https://qorinai.ai/insights/power-not-demand.html</guid>
      <description>Victoria carries 9 GW+ of planned data-centre capacity and expects ~0.7 GW online by 2030. The gap is transmission connection, contingency limits and terminal-station capacity — not customers.</description>
      <pubDate>Fri, 18 Sep 2026 09:00:00 +1000</pubDate>
    </item>
  </channel>
</rss>
